6YRSShenzhen Li Yan Technology Co., Ltd.

회사 개요

회사 앨범

기본 정보

제품 용량

생산 흐름

Hit the screw assembly
1. Place the PCBA on the EVA and align it with the screw holes. 2. The screw is placed at the reverse screw hole position.
Stamping/sealing
The silicone USB cover is passed through the plastic and the interface is sealed with a silicone meter.
Solder
1. Weld the two wires below the snap button at the hole position. 2. The other ends are soldered to the PCB boards OUT1 and OUT2 respectively.
Paste
1. Stick 3M glue to the bottom of the battery to the bottom of the plastic case. 2. The other side of the battery is EVA
package
1.Place the charging cable, main unit and manual into the blister box slot. 2.Put the color box sideways into the outer box

생산 장비

이름
아니요
수량
검증됨
DC power supply
TXN-1502D
5
검증됨

공장 정보

공장 규모
Below 1,000 square meters
공장 국가/지역
No.5 Qundai Road, Jiangling Community, Pingshan New District, Shenzhen City, Guangdong Province, China
생산 라인 수
Above 10
계약 제조
OEM Service Offered
연간 출력 값
US$10 Million - US$50 Million

연간 생산 능력

제품 이름
생산 수량
역대 최고
상품 유형
검증됨
Abdominal device
250500
410020
Piece/Pieces
검증됨

품질 관리

품질 관리 절차

Board test
1. Insert the battery terminal into the PCBA terminal. 2. The universal meter tests whether the PCBA voltage and current are normal.
Finished product inspection
1. Is the detection of the plug hole correct? 2. Is the test voltage and current normal? 3. Is there any abnormality in each button function measured?
high temperature test
Electrothermal constant temperature drying test
Test stand
PCBA test
Multimeter
Organization of test products

시험 장비

기계 이름
브랜드 및 모델 번호
수량
검증됨
DC power supply
TXN-1502D
5
digital storage oscilloscope
UTD2102CEX
3
Electrothermal constant temperature drying box
202-00
2
Electronic scale
TCS-11
5
Vernier caliper
0-150mm
3
Multimeter
-
3
Test stand
-
5
검증됨